(A) For electrical permits issued and obtained prior to commencement of the work for which the permit is required, the following fees shall be levied as set forth in divisions (A)(1) through (A)(9), with a minimum permit fee as set forth in the Appendix: Schedule of Fines and Fees.
(3) Each circuit (new or replaced): see Appendix: Schedule of Fines and Fees. If the exact number of circuits is unknown at the time of application for a permit, a permit may be taken for the minimum amount known with new permits issued as the extent of the work known.
(4) Horsepower (hp) (machinery). If the exact number of horsepower is unknown at the time of application for a permit, a permit may be taken for the minimum amount known with new permits issued as the extent of the work known.
(B) For electrical permit issued and obtained after the commencement of the work for which the permit is required, a fee equivalent to three times that required for a permit if issued prior to commencement of that work shall be levied.